It is essential when installing toilet or shower cubicles to adhere to procedures. Preparation is the key and to over look these simple instructions may cause big problems later on inside installation process. Now be sure to have the constituents needed to install your cubicle. Just follow these clear to see instructions, ensuring that your lines are vertical as you've areas like floors or walls, that may be from true, as well as your cubicles will likely be placed in no time whatsoever. Step 1 Measuring upMeasure and mark off a vertical line about the back wall for your positions of the wall partitions to the cubicles. Mark around the wall the positions to fix the three back wall brackets.Step 2 Fitting BracketsFix? the back wall channel brackets as essential for each partition for the vertical line drawn on the wall.Step 3 Fitting PartitionsPosition? the wall panels in the brackets and be sure the partition is level while using the adjustable legs fixed to the wall panels.Draw the complete position of the holes inside channel brackets on the walls of each one partition ready for drilling. Drill the hole utilizing a 10mm drill bit and fix the brackets to the partition walls while using T-nuts provided.Step 4 Fitting Partition SupportCheck? the attached the adjustable leg to the partition, and conform to correct height. Ensure the partition is aligned correctly and connect adjustable legs for the floor. http://www.adamsplanet.com/members-2/finksantos51/activity/211406/ Fitting Fascia PanelsMeasure? up and mark off a vertical line around the side wall if fixing to some wall. Fix the three wall brackets the wall. Make sure the hinge panel is level and mark from the positions of the 3 brackets about the fascia. Fix the hinge wall to fascia channel brackets while using the T-nuts provided. Your pilaster (central fascia panel) can have the hinge holes pre-drilled and merely fix those while using T-nuts provided.Step 6 Fitting Head RailWith? the partitions and fascia fixed the pinnacle rail should be put in position over the tops in the fascia bridging the door gap. Fix your head rail permanently by attaching on the fascia.Step 7 Fitting the doors, hinges and lock assemblyAttach the hinges on the doors. Attach the indicator bolt for the door. Block the doors up towards the level with the hinge panel bottom using wood and put the door around the blocks. Engage the lock and mark over indicator bolt about the fascia at the point you want to attach the keep. Mark from the hinge placement on the hinge panel. To drill the hinge holes get rid of the nut with the bottom of the hinge and reassemble and attach the hinges towards the walls ensuring the threshold is hung horizontal. Unlock the indicator bolt and fasten the keep using the fixings provided. Set back the plastic sleeves inside the hinge to the door to seal closed or open.


トップ   編集 凍結 差分 バックアップ 添付 複製 名前変更 リロード   新規 一覧 単語検索 最終更新   ヘルプ   最終更新のRSS
Last-modified: 2023-09-11 (月) 07:46:48 (239d)